亚洲一区二区三区国产四区,亚洲国产另类久久久精品极度,国产午夜福利在线观看视频_,色噜噜噜狠狠色综合久夜色撩人,久久精品国产99国产精品抖音
遼寧多綸機(jī)械有限公司

NEWS

PRODUCT

SEARCH

CONTACT

Liaoning Duolun Machinery Co., LTD

Add: No 18, Ganquan Road, Zhenxing District, Dandong, Liaoning,China

Tel: 0086- 415- 6181481

Fax: 0086- 415- 6178681

Zip code: 118009

Website: m.gphjh.com.cn

E-mail: dolun@sohu.com


Daily maintenance of non spinning equipment of the spinning head assembly

Your current location: HOme >> News >> technical centre

Daily maintenance of non spinning equipment of the spinning head assembly

Date:2015-11-04 00:00 Source:http://m.gphjh.com Click:

Head screw assembly 1) neat a) raw materials are stacked neatly. B) maintenance tools, the fragmented parts to close the box to put. C) plastic turnover basket stacked neatly, sanitary utensils neatly placed in the designated position. D) do not place flammable compared machine tools and accessories are placed. E) spare parts should be kept clean, oil anti rust exergy stored neatly in the specified location. F) the equipment is in good condition. 2) clean a) before starting the clean production line product contact surface be clean without debris, exergy. B) appearance and cleanliness of the surrounding area without debris, grease. C) on the back of a clean room from the body surface, the transmission straight gear box, poor motivation, synchronous wheel. The outer surface of D) from site health channel, clean and clean the window wall below the machine. E) the electronic control unit shall be kept clean and complete. 3) a) each lubricating cutter, cut roller, linoleum should be kept moist to add lubricating oil exergy. B) check the status of the chain lubrication and add the lubricating oil to the shortage. C) to check whether the main bearing lubrication has no good exergy high or abnormal sound. D) to clean the rubber parts, plastic parts, paint only water and alcohol. 4) security a) production line in the operation of the abnormal sound exergy timely stop adjustment. B) each belt and belt are in normal working condition. C) internal and external cutter adjustment. D) the running status of the electrical equipment of the time inspection. E) any inspection electric control cabinet, operation table, electronic components of each electric motor, solenoid valve working condition. F) always observe the part work of exergy abnormal should immediately stop repair. G) the spare parts of the machine. Non spinning equipment: http://www.rywfjx.com) the record is good, clear, complete, correct and timely fill in the maintenance records.

Spinneret assembly


Related Tags:Spinneretassembly

Recently viewed:

Share
Welcome to our message
Please enter the message, we will contact you soon.
Name
Contact
Phone
Phone / mobile number
亚洲一区二区三区国产四区,亚洲国产另类久久久精品极度,国产午夜福利在线观看视频_,色噜噜噜狠狠色综合久夜色撩人,久久精品国产99国产精品抖音